Laws: Cases and Codes : U.S. Code : Title 49 : Section 60104


   
U.S. Code as of: 01/19/04
Section 60104. Requirements and limitations

      (a) Opportunity To Present Views. - The Secretary of
    Transportation shall give an interested person an opportunity to
    make oral and written presentations of information, views, and
    arguments when prescribing a standard under this chapter.
      (b) Nonapplication. - A design, installation, construction,
    initial inspection, or initial testing standard does not apply to a
    pipeline facility existing when the standard is adopted.
      (c) Preemption. - A State authority that has submitted a current
    certification under section 60105(a) of this title may adopt
    additional or more stringent safety standards for intrastate
    pipeline facilities and intrastate pipeline transportation only if
    those standards are compatible with the minimum standards
    prescribed under this chapter. A State authority may not adopt or
    continue in force safety standards for interstate pipeline
    facilities or interstate pipeline transportation. Notwithstanding
    the preceding sentence, a State authority may enforce a requirement
    of a one-call notification program of the State if the program
    meets the requirements for one-call notification programs under
    this chapter or chapter 61.
      (d) Consultation. - (1) When continuity of gas service is
    affected by prescribing a standard or waiving compliance with
    standards under this chapter, the Secretary of Transportation shall
    consult with and advise the Federal Energy Regulatory Commission or
    a State authority having jurisdiction over the affected gas
    pipeline facility before prescribing the standard or waiving
    compliance. The Secretary shall delay the effective date of the
    standard or waiver until the Commission or State authority has a
    reasonable opportunity to grant an authorization it considers
    necessary.
      (2) In a proceeding under section 3 or 7 of the Natural Gas Act
    (15 U.S.C. 717b or 717f), each applicant for authority to import
    natural gas or to establish, construct, operate, or extend a gas
    pipeline facility subject to an applicable safety standard shall
    certify that it will design, install, inspect, test, construct,
    operate, replace, and maintain a gas pipeline facility under those
    standards and plans for inspection and maintenance under section
    60108 of this title. The certification is binding on the Secretary
    of Energy and the Commission except when an appropriate enforcement
    agency has given timely written notice to the Commission that the
    applicant has violated a standard prescribed under this chapter.
      (e) Location and Routing of Facilities. - This chapter does not
    authorize the Secretary of Transportation to prescribe the location
    or routing of a pipeline facility.



Previous [Notes] Next

Related Resources

Department of Transportation Guide

Transportation Discussion

Ads by FindLaw