Laws: Cases and Codes : U.S. Code : Title 43 : Section 620


   
U.S. Code as of: 01/19/04
Section 620. Upper Colorado River Basin; purpose of development of water resources; initial units; construction of Wayne N. Aspinall unit contingent upon certification; participating projects; Rainbow Bridge National Monument

      In order to initiate the comprehensive development of the water
    resources of the Upper Colorado River Basin, for the purposes,
    among others, of regulating the flow of the Colorado River, storing
    water for beneficial consumptive use, making it possible for the
    States of the Upper Basin to utilize, consistently with the
    provisions of the Colorado River Compact, the apportionments made
    to and among them in the Colorado River Compact and the Upper
    Colorado River Basin Compact, respectively, providing for the
    reclamation of arid and semiarid land, for the control of floods,
    and for the generation of hydroelectric power, as an incident of
    the foregoing purposes, the Secretary of the Interior is authorized
    (1) to construct, operate, and maintain the following initial units
    of the Colorado River storage project, consisting of dams,
    reservoirs, powerplants, transmission facilities and appurtenant
    works: Wayne N. Aspinall, Flaming Gorge, Navajo (dam and reservoir
    only), and Glen Canyon: Provided, That the Wayne N. Aspinall Dam
    shall be constructed to a height which will impound not less than
    nine hundred and forty thousand acre-feet of water or will create a
    reservoir of such greater capacity as can be obtained by a high
    waterline located at seven thousand five hundred and twenty feet
    above mean sea level, and that construction thereof shall not be
    undertaken until the Secretary has, on the basis of further
    engineering and economic investigations, reexamined the economic
    justification of such unit and, accompanied by appropriate
    documentation in the form of a supplemental report, has certified
    to the Congress and to the President that, in his judgment, the
    benefits of such unit will exceed its costs; and (2) to construct,
    operate, and maintain the following additional reclamation projects
    (including power-generating and transmission facilities related
    thereto), hereinafter referred to as participating projects:
    Central Utah (initial phase and the Uintah unit), San Juan-Chama
    (initial stage), Emery County, Florida, Hammond, La Barge, Lyman,
    Navajo Indian, Paonia (including the Minnesota unit, a dam and
    reservoir on Muddy Creek just above its confluence with the North
    Fork of the Gunnison River, and other necessary works), Animas-La
    Plata, Dolores, Dallas Creek, West Divide, San Miguel, Seedskadee,
    Savery-Pot Hook, Bostwick Park, Fruitland Mesa, Silt and Smith
    Fork: Provided further, That as part of the Glen Canyon Unit the
    Secretary of the Interior shall take adequate protective measures
    to preclude impairment of the Rainbow Bridge National Monument.



[Notes] Next

Related Resources

Property Law Guide

Property Law Articles and Documents

Property Law Discussion

Ads by FindLaw