Section 2280. Maximum cost of projects

      In order to insure against cost overruns, each total cost set
    forth with respect to a project for water resources development and
    conservation and related purposes authorized to be carried out by
    the Secretary in this Act or in a law enacted after the date of the
    enactment of this Act, including the Water Resources Development
    Act of 1988, or in an amendment made by this Act or any later law
    with respect to such a project shall be the maximum cost of that
    project, except that such maximum amount - 
        (1) may be increased by the Secretary for modifications which
      do not materially alter the scope or functions of the project as
      authorized, but not by more than 20 percent of the total cost
      stated for the project in this Act, in any later law, or in an
      amendment made by this Act or any later law; and
        (2) shall be automatically increased for - 
          (A) changes in construction costs applied to unconstructed
        features (including real property acquisitions, preconstruction
        studies, planning, engineering, and design) from the date of
        enactment of this Act or any later law (unless otherwise
        specified) as indicated by engineering and other appropriate
        cost indexes; and
          (B) additional studies, modifications, and actions (including
        mitigation and other environmental actions) authorized by this
        Act or any later law or required by changes in Federal law.